Skip to content
Rail passengers and motorists are being advised to plan their journeys ahead
Rail passengers and motorists are being advised to plan their journeys ahead

Press release -

Southern passengers told to plan ahead as level crossing set to close for entire weekend at the end of November

Network Rail has issued the following press release:

Work to replace railway track on the level crossing means that diversions will be necessary for motorists, pedestrians and cyclists, with buses replacing trains between Brighton and Littlehampton all weekend

People in Portslade are being advised to plan ahead as track work taking place over Portslade level crossing on Boundary Road will close it for two days, resulting in diversions for motorists, pedestrians and cyclists.

The work taking place from 01:00, Saturday 30 November through to 02:00, Monday 2 December, means that motorists are advised to use the A270 Old Shoreham Road as a diversionary route.

The old underpass – a former cattle tunnel - will remain open for pedestrian use.

Shuttle bus service

A shuttle bus will also be available for people with wheelchairs, pushchairs and those who are unable to make use of the underpass. The bus will pick up and drop off between Portslade railway station car park, north of the level crossing (next to the cycle hub), and Portslade station (stop C) outside Station Kebab House.

The shuttle will operate from 01:00 on Saturday 30 November through to 02:00 on Monday 2 December when the crossing reopens.

Brighton & Hove buses

Brighton & Hove buses (route numbers 6 and 46) will be diverted via Old Shoreham Road, Olive Road and Portland Road.

Route 1X will run via route 1 using Station Road, A259 and Church Road in both directions.

Southern Railway

As part of the work, buses will replace trains all weekend between Brighton and Littlehampton.

Rail services that usually run between London Victoria and Littlehampton will be diverted to terminate at Brighton only.

Trains will continue to run between Littlehampton and Portsmouth Harbour or Southampton Central.

Lucy McAuliffe, Network Rail’s Sussex Route director said: “We’re replacing worn-out track in the Portslade area with new rails, sleepers, and ballast – the small rocks underneath the track that support the rails and the sleepers. This essential work will mean a safer and more reliable railway for passengers.

“To complete the work, we need to close the railway, and as the work is taking place near the level crossing, it needs to close as well. The underpass will remain open, and a shuttle bus is in place for the less mobile.

“We’re asking motorists to leave a bit more time to travel as the diversion will mean slightly journeys. Trains will be replaced by buses when the work is being carried out. Thank you for bearing with us while we work to improve the railway.”

Jenny Saunders, Southern’s Customer Services Director, said: “We thank passengers and road users for their patience while these essential works are under way.

“It means we won’t be running trains between Brighton and Littlehampton all day on Saturday, November 30 and Sunday, December 1.

“Instead, rail replacement buses will run between Brighton and Littlehampton. Please plan your journey ahead of time using the Southern website.”

ENDS

Related links

Topics

Categories


For more information, contact the press office on 0203 750 2031.

Govia Thameslink Railway

Govia Thameslink Railway (GTR) operates Thameslink, Great Northern, Southern and Gatwick Express services as follows:

  • Thameslink – cross-London services between Bedford/Peterborough/Cambridge and Brighton/Horsham/East Grinstead, and between Luton/St Albans and Sutton/Wimbledon/Rainham; plus services between London and Sevenoaks
  • Great Northern – services between London and Welwyn, Hertford, Peterborough, Cambridge and King’s Lynn
  • Southern – services between London and the Sussex coast (Brighton, Worthing, Eastbourne, Bognor Regis, Hastings) and parts of Surrey, Kent and Hampshire (Ashford International, Southampton, Portsmouth)
  • Gatwick Express – fast, non-stop direct services between Gatwick Airport and London Victoria

www.southernrailway.com, www.thameslinkrailway.com, www.gatwickexpress.com, www.greatnorthernrail.com

Media Content Panel
Portslade level crossing.JPG
Portslade level crossing.JPG
License:
Media Use
File format:
.jpg
Size:
640 x 480, 79.8 KB
Download

Related content

Govia Thameslink Railway

United Kingdom