Changi Airport frontline staff honoured for exceptional service
Changi Airport Group (CAG) conferred its highest honours today to outstanding staff of the airport community. These are the staff that have gone beyond the call of duty and demonstrated exceptional service contributions in 2014, leaving deep and lasting impressions on both local and international passengers travelling through Changi Airport.
Singapore-based Japanese engineer wins S$1 million at Changi Airport
A 34-year-old Japanese civil engineer working in Singapore struck a windfall of S$1 million at Changi Airport today, as he beat five other contestants to emerge a newly-minted millionaire at the ‘Be a Changi Millionaire’ 2014 Grand Draw.
Changi Airport crosses 54-million passenger mark in 2014
Singapore Changi Airport managed 54.1 million passenger movements in 2014, the most in its 33-year history. This was a 0.7% increase compared to the whole of 2013. Cargo volumes were stable at 1.84 million tonnes while flight movements dipped 0.7% to 341,390 for the year.
Operating Indicators for November 2014
Singapore Changi Airport handled 4.42 million passenger movements in November 2014, a decrease of 1.1% year-on-year. Aircraft movements were 5% lower with 28,000 take-offs and landings. In the same month, 156,500 tonnes of cargo was handled, 2.2% lower than a year ago.
Singapore Changi Airport breaks new ground with Jewel
Lifestyle destination to feature five-storey Forest Valley with majestic waterfall, unique play areas, new retail brands and facilities for travellers
Operating Indicators for October 2014
Passenger traffic at Singapore Changi Airport grew 1.9% on-year in October 2014, with 4.49 million passengers passing through the airport. There was a 2.1% increase in airfreight movements, with 159,700 tonnes of cargo handled during the month. Aircraft landings and takeoffs decreased by 3.7% to 28,380.
Changi Airport transforms into an around-the-world winter wonderland this Christmas
SINGAPORE, 13 November 2014 – A sprinkling of snow; a touch of winter and a dazzle of Disney magic will welcome travellers and visitors this Christmas as Changi Airport transforms into a winter wonderland, bringing yuletide festivities to life. Following the popularity of its annual year-end celebrations, Changi Airport will once again be pulling all stops to bring happiness to its visitors.
T1 open-air car park to close on 12 November for redevelopment
The open-air car park fronting Terminal 1 (T1) will be closed for redevelopment on 12 November 2014 (Wednesday), 2.00am. Until the completion of the redevelopment works in 2018, there will be new ground transport arrangements for T1 passengers and visitors.
Temporary closure of Changi Airport T1 open-air car park and other ground transport changes to take place over this weekend
• T1 open-air car park to be closed; T1 Car Park relocated to T2 • T1 Arrival pick-up point to be shifted outside T1 Arrival Hall • Instructional videos to guide drivers available on changiairport.com website • Temporary arrangements to take place from 2.00am Friday (17 Oct) to 2.00am Tuesday (21 Oct)